Challenges

Lesotho is among the world’s poorest countries, with over 50 per cent of the population living below the poverty line. The country is relatively devoid of most natural resources, particularly arable land. However, it has abundant water resources, which exceed requirements for possible future irrigation projects and development. Meanwhile, South Africa, which borders Lesotho, is a semi-arid country characterized by low rainfall, limited underground aquifers, and heavy reliance on water transfers from Lesotho. The Lesotho Highlands area is one of the primary water sources of the Vaal River, which provides water for Gauteng, Free State, Northwest, and Mpumalanga provinces, together representing roughly 60 per cent of South Africa’s GDP and 45 per cent of its population. Water supply shortages in this area now pose a significant threat to South Africa’s sustainable development. 

Toward a Solution

The Lesotho Highlands Water Project (LHWP) is a multi-phased project intended to provide clean water and sanitation to the Gauteng region of South Africa and to generate hydro-electricity for Lesotho. It was established by a 1986 Treaty signed by the Governments of the Kingdom of Lesotho and the Republic of South Africa. The project entails harnessing the waters of the Senqu/Orange River in the Lesotho highlands through the construction of a series of dams for the mutual benefit of the two countries. LHWP aimed to utilize the vast abundance of water in Lesotho to combat the water shortage experienced by the densely populated Gauteng Province in South Africa, and to foster industrialization in Lesotho. This initiative is a solution to achieve universal and equitable access to safe and affordable drinking water for South Africa while simultaneously providing reliable and sustainable energy, decent jobs, equitable income, and resilient infrastructure to Lesotho, thus promoting inclusive and sustainable economic growth for both countries. The initiative virtually extends across all 8 Priority Areas of the Istanbul Programme of Action (IPoA) and primarily covers nine SDGs, namely, 6, 7, 9, 10, 11, 12, 13, 15 and 17. 

This South-South cooperation project between Lesotho and South Africa is supported by the World Bank Group. It is a contractual agreement governing the design, construction, operation, and maintenance of the project, as well as the export of water to South Africa overseen by the Lesotho Highlands Development Authority and Trans-Caledon Tunnel Authority referred to as implementing and borrower agencies respectively. The Joint Permanent Technical Commission (JPTC)?has a monitoring, advisory and approval function with regard to the project implementation in Lesotho. 

The Lesotho Highlands Development Authority (LHDA)?was set up to manage that part of the project that falls within Lesotho’s borders; the construction, operations and maintenance of all dams, tunnel power stations and infrastructure as well as secondary developments such as relocation, resettlement, compensation, supply of water to resettled villages, irrigation, fish hatcheries and tourism. 

The Trans-Caledon Tunnel Authority (TCTA)?in South Africa manages the delivery tunnel transporting the water over (or rather, under) the border (the Caledon River) to the As River, as well as all structures required to integrate and control the flow of Lesotho water in the river. 

The LHDA reports to the JPTC on all matters concerning the project. However, TCTA, with its structures now complete, is accountable to the Lesotho Highlands Water Commission (LHWC) with regard to operations and maintenance issues. 

The contribution of the LHWP to the socio-economic activity of Lesotho has been remarkable. ?There are compensation programmes for affected communities (including resettlement), income restoration and rural development, biodiversity conservation, and the construction of health clinics. Royalties from the sale of water, the sale of electricity, and construction activities (road networks, technology transfer, and other infrastructural developments) and Southern African Customs Union (SACU) revenues have provided an important economic boost to Lesotho. For South Africa, the water cools the Eskom power stations, keeps Sasol and the Free State gold mines operational and supplies the vast industries and sprawling urban areas and cities of Gauteng with clean water and sanitation. It also supplies water to some of the southern towns of Limpopo and the platinum mines of Northwest, as well as the diamond mines and people of Kimberley and surrounding areas. These are semi desert regions with sparse annual rainfall of 50 mm – 400 mm (2 to 16 inches) per annum. 

The early involvement of the World Bank has been beneficial in many ways. It provided credibility to the project and also greatly assisted the engineering and environmental aspects through the Engineering and Socio-environmental Panel of Experts.  

This project can be replicated to other countries, that have similar context, by ensuring the following:  the oversight and implementation responsibilities on a large development project should be clearly delineated and be separate functions; costs and benefits need to be shared in an equitable and clear manner; contracts and financing arrangements require careful planning; tight procurement processes should be institutionalized to prevent corruption, while whistle-blowing should be encouraged. The maintenance of the welfare of the persons and communities directly benefitting from the project is a powerful guiding principle for socio-environmental policies.  

Additionally, such socio-environmental programmes require careful planning, rigorous implementation, and phased exit strategies that are clear to all involved stakeholders. It is important to do the environmental impact assessments and action plans before any construction starts. Also, the resettlement and compensation policies should be clear, transparent, and adaptable. Communication channels to the affected communities need to be established and utilized at the outset. A rigorous complaints procedure has to be in place too, so that any concern or grievance can be dealt with as soon as possible. Compensation officers have to be empowered to settle minor claims immediately. 

 

CONTACT INFORMATION
Ms. Refiloe Tlali, Public Relations Officer, Lesotho Highlands Development Authority (LHDA)
SDG
06 - Clean Water and Sanitation
SUPPORTED BY
The World Bank

ABOUT

Terms of Service

Privacy Policy

Disclosures

RESOURCES

Terms of Service

Privacy Policy

Disclosures

ENGAGE

Terms of Service

Privacy Policy

Disclosures

Copyright © UNOSSC/UNDP

wpChatIcon
wpChatIcon

Alliance Application Form

Submit an Expression of Interest and/or Demand Signal. UNOSSC reviews submissions on a rolling basis.

1. Official name of organization / institution / government entity (exclusions to apply) *
2. Country *
3. Region *
4. SDG *
Secondary SDG *
5. Partner category *
6. Website *
7. Brief description of your institution (max. 150 words) *
Name for the Lead *
Title for the Lead *
Email address for the Lead *
Name for the co-lead
Title for the co-lead
Email address for the co-lead
Section 3. Expression of Interest in the Alliance *
Additional information on proposed areas of engagement may be requested through the platform following initial review by the Alliance Secretariat.
Section 4. Due Diligence and Integrity Declaration *

Submission Note:

  • Submission of this Expression of Interest form does not automatically confer participation in the Alliance.
  • All submissions will be reviewed by the Alliance Secretariat, including basic eligibility screening and proportionate due diligence, as appropriate.
  • Participation in Alliance activities is determined based on relevance to articulated cooperation needs, alignment with Alliance principles, and integrity considerations.
  • Engagement under the Alliance is voluntary, non-binding, and facilitative in nature, and does not constitute funding approval, contractual commitment, or institutional membership.
  • The Alliance Secretariat may contact submitting entities for additional information or clarification during the review process.

Submission of Demand Form

Description of Demand

Indicate the type of support or cooperation requested through the Alliance.
Please briefly describe the challenge, gap, or priority. (Max. 300 words)

Thematic and Geographic Focus

Please indicate the main focus areas of your demand:

A. Thematic Areas (select up to three)
B. Geographic Focus (select all that apply)

Proposed Engagement Modalities

Please indicate how you would like to engage through the Alliance (select all that apply):

Expected Outcomes

Please indicate the main results you seek to achieve through this engagement. (Max. 200 words)
Examples:
• Capacity strengthened
• Partnerships established
• Sectoral or regional strategies co-developed
• Solutions piloted
• Knowledge generated
• Policies informed

Timeline and Readiness (if applicable)

1. Expected timeframe for engagement:
2. Current stage:

Additional Information

Please provide any additional information, documents, or links relevant to this submission.
(Max. 200 words or upload link)

Submission of Offer Form

Description of Contribution

Indicate the type of contribution your institution can provide and describe the expertise, resources, or solutions you may offer.
Please briefly describe your proposed contribution. (Max. 300 words)

Thematic and Geographic Focus

Please indicate the main focus areas of your interest:

A. Thematic Areas (select up to three)
B. Geographic Focus (select all that apply)

Proposed Engagement Modalities

Please indicate how you would like to engage through the Alliance (select all that apply):

Expected Outcomes

Please indicate the main results you aim to achieve through this engagement. (Max. 200 words)
Examples:
• Capacity strengthened
• Partnerships established
• Sectoral or regional strategies co-developed
• Solutions piloted
• Knowledge generated
• Policies informed

Timeline and Readiness (if applicable)

1. Expected timeframe for engagement:
2. Current stage:

Additional Information

Please provide any additional information, documents, or links relevant to this submission.
(Max. 200 words or upload link)

Organization Registration

Authentication & Due Diligence This prototype simulates identity verification, due diligence confirmation, and an authentication step before submission. *

First Name *
Last Name *
Email address *
Password *
Confirm Password *
Name of institution / organization *
Country / Region *
Organization Type *
Organization other *
Function / role *
Organization logo *
Maximum file size: 1 GB

Login

Login / email *
Password *
Remember me

Forgot password?

Connect form

Your name *
Email *
Organization / institution *
Job title / role *
Reason for connecting:
Short message

Scroll to Top